On a permitted Chicago deck or porch job, ask who schedules each required inspection, what needs to remain visible and how you will receive the result. A finished deck and an issued permit are not proof that the inspection process is complete.
Tie the appointments to the scope
Ask the contractor for the issued permit and approved plans if applicable. Then ask which inspections the city requires for this work and what the inspector needs to see at each appointment. Chicago's visibility provision requires work that needs a permit to stay visible and accessible until inspected. Have the contractor confirm which parts can be covered and when; don't go onto an unfinished structure to inspect it yourself.
Route a violation through the notice
If a violation prompted the job, read the notice rather than assuming that the routine appointment path resolves the case. Chicago's porch and deck guide gives different instructions for Administrative Hearings and Circuit Court. Ask who will get you the relevant follow-up instructions and evidence of the outcome. If the scope changes or the project doesn't have an issued permit yet, return to the license and permit checklist.
Check what was recorded, not just what was scheduled
Keep the permit number, applicable plans, appointment dates, inspection results and any corrections or follow-up records together. Chicago's building department search returns records when the system has them. Treat a permit, an inspection result and a correction as separate records. The public system's user agreement does not promise a complete or current record. If the result is missing or unclear, ask for clarification rather than treating it as a pass. In your written scope, name who provides the final inspection record and handles unresolved corrections.