Compare deck bids by lining up what each contractor will remove, keep, replace and leave to someone else. Two proposals for the same footprint can describe very different jobs, especially if one assumes the old structure stays and the other replaces it.

Put the work in matching rows

The Illinois Attorney General's home repair guide recommends collecting written estimates for the same work. Use this table to bring the proposals to the same starting point. Write “not stated” wherever the proposal is silent.

Compare Ask each bidder to show in writing
Removal and retention What comes out, what stays, and who removes debris?
Structure and surface Which boards, joists, beams, posts, footings and house connections are included or excluded?
Stairs and guards Are the stair supports, treads, guard assemblies and handrails part of the bid or separate?
Administrative work Who arranges plans, permits, appointments and responses to corrections?
Site and handoff How will the household use another entry if needed, and what records or product documents will you receive?

The American Wood Council's DCA 6 guide provides vocabulary for separating visible surfaces from the framing and connections beneath them. Use its diagram to ask better questions, not to decide whether a given detail is allowed in Chicago.

Agree on what happens when the bid's assumption fails

If a board-only proposal assumes concealed framing can stay, ask what evidence supports that assumption and what could change it after removal. State who documents the discovery and which work pauses until you receive and approve a written revision. Reserve the decision to resurface or replace until the supporting structure has been assessed; do not accept “as needed” in place of a decision point. The FTC's contract guidance recommends getting oral promises about scope into the written agreement.

Compare totals only after the differences are visible

Separate mandatory work from genuine options. If one quote includes plans and inspection coordination and the other leaves both to you, ask for an equivalent scope or keep those differences visible in your comparison. Once the proposals describe the same job, check references for how each builder handled changes, not just how the finished deck looked.